Module 6 Base Liner System Call for Bids

Mandatory Pre Bid Conference February 1, 2019 at 10 am
Bids due March 5, 2019 at 2 pm

You are invited to bid on a General Contract for the construction of a lined solid waste disposal cell at the Monterey Peninsula Landfill, a Class III municipal solid waste landfill. The engineer’s estimate for construction is approximately $4,950,000. Work involves construction of (1) approximately 14 acres of composite base liner, consisting of a compacted clay liner, and a HDPE geomembrane, and (2) a leachate collection and removal system, consisting of HDPE piping, gravel drainage material, geotextile, and on-site sand drainage soil. The work also includes excavation of native sand and clay soils, subgrade preparation, and placement of engineered fill.

Complete Module 6 Invitation to Bid

Module 6 Construction Quality Assurance Plan

Module 6 Construction Specifications

Construction Drawings Module 6 Liner System